We haven't posted for a while. The exterior has been mostly painted. We need to have some trim work redone, but it is looking very good. They've got the ductwork almost complete for the HVAC and most of the plumbing is in. We have a bathtub in the upstairs bathroom, and have purchased the clawfoot tub for the master bath. The brick should be installed sometime next week, as well as the insulation and sheet rock. So thing are moving along. We don't know if we can be in before Christmas or not, but we are working toward it. I will post more photos later.
No comments:
Post a Comment